PREPARATION FOR EQUIPMENT DELIVERY AND INSTALLATION IS THE RESPONSIBILITY OF THE CUSTOMER

A licensed electrician and a licensed plumber should prepare the site for installation of coffee equipment.

ELECTRICAL INSTALLATION

  • Customer is responsible to provide:
    • A dedicated circuit and circuit breaker for each coffee machine.
    • Code appropriate wiring for American manufactured 220v machines, 4-wire twist-lock receptacle, line-cord and twist-lock mating plug to match within 36” of machine, and within easy reach of equipment technician and above counter level. see diagrams below.


PLUMBING INSTALLATION

  • Customer is responsible to provide:
    • Fresh cold water PSI to meet mfg required model specific Specifications.
    • In-coming cold water line within 24” of machine inlet valve, and above counter level
    • Each incoming waterline must be provided with a shut off valve within 24” of the machine inlet valve and above counter level.
    • Back-flow prevention device acceptable to local health / building authorities where required.
    • Model specific machine inlet fitting: check model Specifications for size of inlet fitting to be supplied.
    • Installing technician must be left with a ½” “female” NPT Fitting.

Below is an image of typical back-flow prevention devices